Upper Atbara and Setit Dam Complex
Dam in Sudan
Read the original on Wikipedia ↗ Last updated from Wikipedia: 29 November 2026
| Upper Atbara and Setit Dam Complex | |
|---|---|
Location within Sudan | |
| Location | Sudan |
| Coordinates | 14°16′36″N 35°53′49″E / 14.27667°N 35.89694°E |
| Construction began | 2011 |
| Opening date | 2017 |
| Construction cost | US$ 1.9 billion |
| Dam and spillways | |
| Impounds | Atbarah River/Setit River |
| Height | Rumela: 55 m (180 ft) Burdana: 50 m (164 ft) |
| Length | 13 km (8.1 mi) |
| Spillway capacity | Rumela: 4,900 m3/s (170,000 cu ft/s) Burdana: 9,400 m3/s (331,958 cu ft/s) |
| Reservoir | |
| Total capacity | 2,700×106 m3 (2,200,000 acre⋅ft) |
| Normal elevation | 517.5 m (1,698 ft) |
| Power Station | |
| Turbines (opens on Wikipedia) | Rumela: 3 x 40 MW (54,000 hp) Francis-type (opens on Wikipedia) Burdana: 3 x 5 MW bulb |
| Installed capacity (opens on Wikipedia) | 135 MW (181,000 hp)[1] |
| Annual generation (opens on Wikipedia) | 380 GWh (1,400 TJ) annually (est.) |
The Upper Atbara and Setit Dam Complex is a twin dam (opens on Wikipedia) complex comprising Rumela Dam on the Upper Atbarah River and Burdana Dam on the Setit (Tekezé) River in eastern Sudan. The site of the twin dam is located about 20 kilometres (12 mi) upstream from the junction of the Atbarah and Setit rivers and about 80 kilometres (50 mi) south of the Khashm el-Girba Dam. Construction began in 2011 was expected to be completed by March 2016.[2] The 320 MW dam was inaugurated by President Omar al-Bashir in February 2017, with final stages completed later that year.[3]

Rumela Dam on the Atbarah is 55 metres (180 ft) tall and Burdana Dam on the Setit is 50 metres (160 ft) in height. The two dams are connected and have a total length of 13 kilometres (8.1 mi). The twin dam complex has a joined reservoir with a storage capacity of about 3.7 billion cubic metres (3,000,000 acre⋅ft) of water.[4] The maximum filling level is 517.5 metres (1,698 ft) above sea level. The project includes the construction of hydropower stations on both Rumela and Burdana dams with a total installed capacity of 320 MW, and annual firm energy of 834 gigawatt-hours (3,000 TJ). [5]
The project was announced in April 2010 with the aims of supporting the development of eastern Sudan by providing irrigation for local agriculture, supplying potable water, and power generation. The project also aimed to increase agriculture production in the New Halfa area of Kassala currently irrigated by the Khashm el-Girba Dam, and the development of new land consisting of 504,200 hectares (1,246,000 acres) in Upper Atbara.[4] Additionally, the dams are expected to provide flood-protection measures along the river banks by regulating the river flow in the project area.
Loading “Project costs”…
Loading “Archaeology”…
Loading “References”…
Loading “External links”…
Image credits (4)
- Upper Atbara and Setit Dam Complex Power Plant.jpg — Shihab E., CC BY 4.0, via Wikimedia Commons
- Sudan relief map.svg — Own work based on User:NordNordWest, CC BY-SA 3.0, via Wikimedia Commons
- Codex icon map color-base.svg — Wikimedia Design & OOUI team and other contributors, Public domain, via Wikimedia Commons
- Red pog.svg — Andux, Public domain, via Wikimedia Commons